THThe Hindu·5dPolitics
score-0.50
KRCL Warns of Deterioration Risk to 110-metre Tunnel as Project Remains Stalled
Original
Kozhikode-Wayanad tunnel project in Keralam remains stalled despite submission of documents
“Highlights project stagnation and specific warnings about structural deterioration, framing the delay as a risk to infrastructure integrity.”